Our main engineering and integration facility in Canada, brings together the talents of over 60 skilled specialists, including Project Management, Design, System Engineering and CAD Teams.
With a staging area of 400 sq. meter, over 140 communications racks can be integrated simultaneously in a facility designed to optimize engineering work flow across the various integration stages, from Storage, Build and Wire, Factory Acceptance Test (FAT) to Systems Integration Test (SIT).
An additional 1 000 sq. meter extends our capabilities to manage large scale logistic and material handling needed for the most complex and logistically demanding projects.